Skip to content

Home construction · Bengaluru

Home construction in Bengaluru, one team start to finish

From soil test to handover — drawings, approval, structure, finishes and interiors, built by one team from Bengaluru.

A two-storey white home with a timber screen across its upper floor, on a quiet street corner with frangipani trees and palms
Illustrative image

Where is your plot?

In short

A home is the largest thing most families will ever build. We make it simple: one team and one contract, from the first drawing to the day you move in.

Chan Constructions is a design-and-build firm based in Bengaluru, Karnataka. We plan every home on paper first — rooms, light, parking, the staircase, even where the switches go — so what gets built is exactly what you agreed.

How a Chan home goes up

Floor by floor.

  1. FoundationDug, reinforced and poured to suit your soil.
  2. FrameColumns, then one slab per floor, each cured before the next.
  3. Walls and servicesBrickwork, conduits, plumbing and waterproofing.
  4. FinishesPlaster, floors, doors, paint and your fittings.
  5. HandoverA joint walk-through, the snag list closed, your keys.
The finished home: two storeys of red brick and teak louvres in a white concrete frame, on a granite plinth
Illustrative image

What turnkey means with us

One contract covers the whole home. You make the decisions; we carry the work, the paperwork and the co-ordination.

Floor plans and a set square on a drawing desk by a windowA plan sheet on a desk with ring stamps on it, a rubber stamp and a tied fileColumn steel tied with rings, rising out of its shuttering against the skyA brick wall with conduits and switch boxes chased in, half plastered, a trowel on a bucket belowA daylit kitchen corner with pale timber wall units, sage green base units and a white counterKeys hanging in the lock of a teak front door, open onto a finished room
  1. Design and drawings

    Soil test, site survey, floor plans, elevations and the structural design, revised with you until the plan is right.

  2. Plan approval

    We prepare the sanction drawings and file and follow up the building-plan application with the city authority.

  3. Structure

    Foundation, columns, beams and slabs built to the structural drawing, with each stage checked before the next begins.

  4. Services and finishes

    Block walls, plastering, plumbing, electrical work, flooring, doors, windows and painting.

  5. Interiors (optional)

    Kitchen, wardrobes, ceilings and lighting, planned with the home so nothing is broken open later.

  6. Handover

    A final walk-through, a snag list we close before we leave, and the drawings and documents for your records.

How we build a home

Six steps, in this order.

  1. A floor plan on a site table on an open plot, with a survey level on its tripod, a tape and a helmet
    Illustrative image

    Plot and plan

    Our engineer visits and measures the plot, and the soil is tested. Then we draw the home with you and revise it until the plan is right.

    • Site visit
    • Soil test
    • 2D plan
    • 3D view
    What a 30×40 home costs, floor by floor
  2. A desk with a picture of a brick home, an open quotation and samples of brick, teak, granite, tile and steel
    Illustrative image

    Quotation and agreement

    One written quotation, made from the drawings. The agreement names every material and brand, and lists the payment stages.

    • Written quotation
    • Materials named
    • 13 payment stages
    See the thirteen payment stages
  3. A fenced plot with lime lines marked on the ground, a site store, a power pole with a meter box and a capped borewell
    Illustrative image

    Approvals and site set-up

    We file the plan and follow it to sanction. A temporary power connection is arranged, and a borewell where the plot needs one.

    • Plan sanction
    • Temporary power
    • Borewell
  4. A roof slab before the pour: a two-way steel mat on its shuttering with cover blocks, conduits and column bars
    Illustrative image

    Structure

    Foundation and plinth first, then columns and one slab for each floor. Every stage is checked against the drawing before the next begins.

    • Foundation
    • Columns
    • Slabs
  5. A room being finished: floor tiles laid with spacers, a tile cutter and a level on the floor, a teak door and a puttied wall
    Illustrative image

    Finishes

    Block walls and plaster, then plumbing, electrical work, flooring, doors, windows and paint, in the materials your agreement names.

    • Plaster
    • Flooring
    • Electrical
    • Paint
    See the materials and brands
  6. The entrance of a finished brick home: a teak door half open, a flower garland over it and keys on a folder of documents
    Illustrative image

    Handover

    A joint walk-through, a snag list we close before we leave, and your drawings and documents. Then ten years of structural warranty.

    • Walk-through
    • Documents
    • Warranty

The detail, when you want it

Before the first brick: the plot and the plan

Every home starts with the plot. Our engineer visits, measures it, notes the road width, the neighbouring buildings and the slope, and we arrange a soil test so the foundation is designed for the ground it actually sits on, not for an average.

Then comes the plan. Most plots in Bengaluru are 20×30, 30×40 or 30×50, and on a small plot every foot counts. We work out the setbacks the rules require first, then fit the rooms, the staircase, the parking and the openings for light and air around them. You see floor plans and elevations, change them as many times as you need, and sign off only when the plan is right. See the cost floor by floor for a 20×30, a 30×40 or a 30×50, or for a duplex. Our elevation designs show the kind of front we plan.

A furnished floor plan in 3D, seen from above, the kind of drawing you sign off before anything is built
Every room drawn and furnished on paper before the first brick. Chan design.

If the home will carry rental units, we plan them now: separate entrances, separate electricity meters and water lines, and a staircase that lets tenants come and go without passing through your home.

A full drawing set for a home with a ground floor and two floors above is 85 sheets. What each set is for is on our About page.

All twelve steps of a build

Every home we build follows the same order. Nothing starts on site until the steps before it are done.

  1. Site inspection. Our engineer visits and measures the plot.
  2. Planning and drawings. 2D plans, 3D views and the structural drawing.
  3. Quotation. A written quotation, made from those drawings.
  4. Agreement. It names the materials, the payment stages and what is not included.
  5. Government plan approval. The sanction drawing is filed and followed up.
  6. Other approvals, if your plot needs them.
  7. Temporary power connection for the construction work.
  8. Borewell, if the plot needs one.
  9. Final design and plan. Both are closed before work starts.
  10. Concreting. Foundation and plinth first, then one roof slab for each floor.
  11. Finishing. Plastering, fabrication, flooring, carpentry, plumbing and electrical work, then painting.
  12. Handover. A joint walk-through and your documents.

Before each next stage starts, the site engineer checks the last one against the drawing: reinforcement before a slab is poured, levels before the walls go up, pipes and conduits before plaster covers them.

Plan approval, handled

No home should start without a sanctioned plan. We prepare the sanction drawings to the city’s building bylaws and file the building-plan application with the city corporation (still widely called BBMP) or with the BDA where your layout falls under it. We follow the file through to sanction and keep you told at every step. What to check first is in our guide, before you build in Bengaluru.

Alongside the plan, a new home needs a temporary power connection from BESCOM for construction, and water and sanitary connections from BWSSB before you move in. We line these up so the site never stands idle waiting for one of them.

Approval fees and deposits are paid to the authority and depend on your plot and building, so they are not part of the contract price. See our construction cost guide for what else a fair quote should list.

The thirteen payment stages

You pay as your home is built. The agreement spreads the price over thirteen stages. Each payment is tied to work you can see on site, and the last 1% is paid at handover.

Payment schedule: thirteen stages and the share of the contract price paid at each
NumberStageSharePaid so far
01On signing the agreement15%15%
02Foundation and plinth concrete complete5%20%
03Before the ground floor roof concrete10%30%
04Before the first floor roof concrete10%40%
05Before the second floor roof concrete10%50%
06Before the terrace floor roof concrete5%55%
07Plastering complete5%60%
08Fabrication complete10%70%
09Flooring complete5%75%
10Carpentry complete5%80%
11Plumbing and electrical complete10%90%
12Painting complete9%99%
13Completion and handover1%100%

From our construction agreement for a home with a ground floor and two floors above. A home with fewer floors has fewer roof stages. Design fees are billed separately.

Materials and brands

The agreement names what your home is built with. These are the materials and brands from our construction agreement; your own agreement lists them the same way, item by item.

  • Concrete: M20 grade, with M-sand and 20 mm jelly
  • Cement: Zuari or JSW, 53 grade
  • Steel: SK Super or Sunvik, Fe550 TMT bars
  • Walls: 6-inch blocks outside, 4-inch blocks inside
  • Water pipes: Ashirvad, Supreme or Astral CPVC
  • Bathroom fittings: Jaquar, Hindware, Parryware or Hansflo
  • Wires: V-Guard, Anchor or Finolex
  • Switches: GM, Lisha or Anchor modular
  • Paint: Birla Opus
  • Windows: UPVC
  • Doors: Burma teak for the main door and the pooja door; sal or neem frames with flush doors for the bedrooms
  • Floors: Vitrified tiles, with granite on the stairs
What the price covers, and what it does not

The contract price covers the build itself: foundation and structure, block walls, plastering, fabrication, flooring, carpentry, plumbing, electrical work and painting, in the materials named in the agreement.

Not in the contract price

  • Temporary water and power while the work is on
  • Earthing and the meter board
  • Wardrobes and kitchen cabinets
  • Fans, geysers and light fittings
  • BESCOM, BWSSB and BBMP deposits and fees
  • Water level controller and UPS
  • GST, which is billed on materials
  • Preliminary work: drafting, survey, soil test, and the elevation and structural design

These are listed in the agreement before you sign, so nothing comes as a surprise later. To see the area you would pay for and a market estimate, try the construction cost calculator, or read construction cost per sq ft in 2026.

One team for the home and its interiors

Most homes are built by one contractor and furnished by another, and the second one often starts by breaking what the first one finished: moving switch points, re-running pipes, cutting ceilings. We design and fit home interiors too, so the kitchen, wardrobes, false ceilings and lighting are planned with the home. The points are in the right place from the day the walls go up.

An open kitchen and living room with a long island, pendant lights and warm wood panelling
Kitchen and living, planned with the home. Chan design.
Rebuilding on an old plot

Many owners in Bengaluru’s older layouts are replacing an old single-storey home with a G+2 or G+3. We handle the demolition, clear and prepare the site, and plan the new home to use what the rules now allow. If the old home only needs repair rather than replacing, we will tell you so honestly.

We build across Bengaluru. Send us your plot’s location and we will tell you honestly how we would run the site from our office.

Packages, priced for your plot

Every package names the cement and steel grade, the tile, sanitary and electrical brands, and what is and isn’t included — so two quotes can be compared line by line, not just rate against rate.

Tell us your plot size and floors and we’ll send the package options, each with its full specification.

Get your package quote on WhatsApp (opens in a new tab)

Why owners choose Chan

From our sites

Under construction · Bengaluru

A home going up on a 30 × 40 ft plot in Bengaluru, photographed stage by stage: footing steel, setting out, a floor slab being poured, block walls and the first door and window frames.

Reviews

Every home has a story. Hear it from the families who trusted us.

Living room from a Chan Constructions penthouse design, seen through an arched opening
Kitchen from the same penthouse design: grey cabinets, marble backsplash, warm shelf lights

From a Chan penthouse design, 2026

Visit the office

2169, 3rd B Main Rd, Hampi Nagar 2nd Stage, Hosahalli Extension, Vijayanagar, Bengaluru 560104
Get directions (opens in a new tab)

Or just call

+91 91088 13366

How we work, next to the usual way

TopicChan ConstructionsA typical contractor
The quoteWritten and itemised after a site visit — cement and steel grade, brands and exclusions named line by line.A per-sq-ft rate with the specification left vague.
PaymentsThirteen stages, each tied to work you can see on site. The last 1% is paid at handover.Large advances before the work starts.
Price changesThe agreement says in writing what happens if material prices move, before you sign.Escalation claims with nothing in writing.
ApprovalsWe prepare the drawings and file and follow up the plan approval.You are handed the drawings and left to run to the office.
QualityA stage-by-stage checklist, shared with you, before each next stage starts.Checked when the owner happens to visit.
After handoverTen years of structural warranty and one year of free maintenance.Often nothing in writing.

Home construction questions

If yours isn’t here, ask us on WhatsApp — a person from our team answers, not a bot.

What does turnkey home construction include?

Everything from the soil test to the day we hand you the keys: architectural drawings, structural design, plan approval, the foundation and frame, masonry, plumbing, electrical work, flooring, painting and fittings. You deal with one team and one contract instead of hiring and chasing separate contractors for each stage.

How long does it take to build a home in Bengaluru?

It depends on the plot, the number of floors and how quickly finishes are chosen. We give you a written stage-by-stage schedule with the quote, before any work starts, and we plan the approval, foundation and frame so that no stage waits on a decision that could have been made earlier.

Do you build on 20×30 and 30×40 plots?

Yes. Most homes in Bengaluru sit on 20×30, 30×40 or 30×50 plots, and small plots are where good planning matters most. Our drawings work out setbacks, the staircase, parking and natural light first, so every square foot the rules allow is put to use.

Can I see the drawings before I sign?

Yes. You see the floor plans and elevations, and you can change them, before the build contract is signed. We would rather spend an extra week on paper than break a wall later. The final drawing is the one filed for approval and the one the site team builds from.

How do payments work?

You pay in stages tied to finished work, such as foundation, each slab, masonry and finishing, never a large lump sum up front. Each stage is written into the contract with its amount, so you always know what the next payment is for and when it falls due.

Who supervises the site every day?

A site engineer from our team runs the site and reports to you directly. You get a single number to call for any question, and you are welcome to visit whenever you like. We check each stage against the drawing before the next one starts, so mistakes are caught while they are cheap.

Can you build a rental or a G+2 home for letting out?

Yes. Many owners in Bengaluru build a G+2 or G+3 with their own home on one floor and rental units on the others. We plan separate entrances, meters and water lines from the start, so each unit can be let, metered and maintained on its own.

Do you do the interiors after the home is built?

We can, and it works best when we know about them early. When the interiors are planned with the home, switch points, plumbing and ceiling heights are placed for the kitchen, wardrobes and lighting from day one, so nothing has to be broken open and redone later.

Tell us about your plot. We’ll take it from there.

Start with a site visit

Tell us where your plot or site is and what you want to build. We’ll call you back, fix a visit, and send a written quote after it.

  1. We call you back
  2. We visit your plot
  3. You get a written quote

Request a call back

No charge for the first visit or the quote.

WhatsApp (opens in a new tab)Call now