What should you check before you build?
Check six things, in this order: your title documents, the type of khata, your e-Khata number, that property tax is paid up, the road width and zone of the site, and the soil. The first four decide whether you can apply at all. The last two decide what you can build.
- Title: the sale deed and an encumbrance certificate, with the owner’s name matching the khata. A mismatch is a common reason a plan gets stuck.
- Khata type: read it on the document itself, not from the seller’s description.
- e-Khata number: the online system starts from it.
- Property tax: clear any dues before you apply.
- Road width and zone: these fix the setbacks and how many floors you can add.
- Soil test: the foundation design depends on it.
What is the difference between A-khata, B-khata and e-Khata?
A-khata and B-khata are statuses. A-khata means the property meets municipal requirements. B-khata means tax is paid but something is short, such as an unapproved layout. e-Khata is only the digital format of the record, so an e-Khata on a B-khata property is still a B-khata.
| What it is | What it means for you | |
|---|---|---|
| A-khata | Meets municipal requirements | Generally needed for plan approval. Banks expect it |
| B-khata | Tax is paid, compliance is short | Plan approval blocked until converted. Loans are difficult |
| e-Khata | The digital record, with a QR code, on e-Aasthi | Reported as mandatory for registration and municipal approvals since 1 November 2025 |
Paying property tax on a B-khata does not turn it into an A-khata. Only conversion does.
Can you build on a B-khata site?
Not with a sanctioned plan. Published guides are clear that a B-khata blocks building plan approval until the site is converted to A-khata, and banks treat these sites as difficult for a home loan. Sort out the khata first, before you pay for drawings or sign a builder.
Building without a sanctioned plan is the expensive way round. Deviations from a plan fall under the Akrama-Sakrama regularisation scheme, which is reported as stayed by the Supreme Court, so there is no easy fix later.
How do you convert a B-khata to an A-khata in 2026?
You apply online through the e-Aasthi portal, with a ₹500 application fee. An inspector checks your documents and the site, and you then pay the betterment charge of 5% of the guidance value. The 2% discount ended on 23 August 2026, but conversion itself has no last date.
- The cost: on a guidance value of ₹80 lakh, 5% is about ₹4 lakh. Other development charges can apply, depending on the property.
- Who qualifies: reported as a B-khata on record on or before 30 September 2024, with tax dues cleared.
- Who does not: land marked for roads, parks or public works, property under a court dispute, and farm land with no conversion order until it has one.
- Papers: sale deed and earlier links, B-khata extract, tax receipt, encumbrance certificate of 15 years, conversion order if the land was agricultural, a sketch, Aadhaar and PAN.
- How long: 30 working days on paper, and reported at four to six weeks for a clean file.
These terms have changed more than once. Confirm the current charge on the portal or at the ward office before you pay.
What is Nambike Nakshe 2.0?
Nambike Nakshe 2.0 is the Greater Bengaluru Authority’s automated plan approval, launched in September 2026. It covers residential sites up to 50×80 ft, or 4,000 sq ft, with up to four dwelling units. A qualified architect files online and a compliant plan is approved in about 30 minutes, against two to three months before.
- Pilot: it starts in selected areas and will be reviewed before it spreads. We have not seen an official list of those areas, so ask your architect whether your site is in one.
- Your khata: enter the e-Khata number and the system pulls the ownership details, so you do not upload the khata again.
- Trust, but verify: software replaces the officer’s check before approval, so the owner and architect carry the responsibility. The minister warned of strict penalties for misuse.
- Not covered yet: commercial buildings and larger developments, which may follow in later phases.
The speed helps only if the plan is right. A plan that gets past the software but breaks a setback rule is still your problem on site, and later when you apply for an occupancy certificate.
How does plan approval work, step by step?
Appoint an architect and settle a design that fits the setbacks and the floor area allowed. The architect uploads the drawings with your e-Khata number, the system checks the plan and works out the fees, you pay online, and you download the sanctioned plan. Then build exactly what it shows.
Keep ready the sale deed, encumbrance certificate, latest tax receipt, drawings (site plan, floor plans, sections and elevation) and a structural stability certificate where it is needed.
The BBMP was replaced by the Greater Bengaluru Authority and its five city corporations, though most people still say “BBMP approval”. If your site is in a BDA layout, read building on a BDA site as well.
What does plan approval cost?
The online system works out the fee from your plot and building, so there is no single figure. Published estimates for plan sanction run from about ₹80,000 to ₹5 lakh. Budget ₹5–10 lakh in all for approvals, connections and site works, on top of the construction cost itself.
Our cost per sq ft guide lists these extras line by line, and the 30×40 guide works them through for the most common plot.
What happens after the plan is approved?
Build to the sanctioned plan, without changing it on site. Moving a wall, adding a floor or eating into a setback is how a clean file turns into a problem when you apply for the occupancy certificate, which an A-khata normally expects for a finished building.
We prepare the drawings and structural design and follow the application for you, so a compliant plan is built in from the start. See how on our home construction page, or look through our home elevation designs.
Sources
Rules and fees on this page come from the published sources below, read on 1 November 2026. They change often, so confirm them on the official portal or with the authority before you pay or build. This is general guidance, not legal advice, and any cost is a market figure, not a quote from Chan Constructions.
- The Bengaluru Live — Nambike Nakshe 2.0 launch: scope, the architect’s role, e-Khata check, pilot and penalties; September 2026. (opens in a new tab)
- Country and Politics — Nambike Nakshe 2.0: residential scope and later phases; 22 September 2026. (opens in a new tab)
- PKP Advocates — B khata to A khata: fee after 24 August 2026, eligibility, documents, process and blocks. (opens in a new tab)
- NoBroker — B khata to A khata in Bangalore: plan approval and bank loans on a B khata; updated 14 May 2026. (opens in a new tab)
- MyPropertyPoint — A khata, B khata and e-Khata: what each one means under the Greater Bengaluru Authority, and the e-Aasthi portal. (opens in a new tab)
- Matrix Realty — Building plan approval in Bengaluru: steps and documents under Nambike Nakshe 2.0. (opens in a new tab)